25 Mile Sanitary Sewer
Project Name S.A.D. 34S Sanitary Sewer
Location Shelby Township, MI
Owner Charter Township of Shelby
Value $6,536,571.49
Project Photos




Project Scope
- Installation of 15,700 FT of sanitary sewer to depths up to 34 FT.
- Dewatering of trench to stabilize excavation.
- Horizontal Directional Drilling of 400 FT of 6-inch sewer lead
- Jack and Bore installation of 1,000 FT of sewer under roads and utilities ranging in diameter from 18-inch to 42-inch.
Project Details
Project consisted of the installation of 15,700 ft of sanitary sewer ranging from 10-inch to 21-inch diameter to service multiple future developments in Shelby Township. Dan’s installed the sewer from Hayes to Jewell road. Dewatering wells were installed along 25-mile to aid in the excavation. Dan’s Excavating and Shelby Township worked together to overcome multiple changes and still finished the project on time and on budget.