Excavating, Inc. (DEI), was under contract with the City of Detroit Engineering
Department to construct the River East Infrastructure Improvements project.
This project was unique in that the City of Detroit and General Motors worked
together to receive a grant from the Michigan Department of Transportation (MDOT)
to construct this project and others to enhance the areas surrounding the
Renaissance Center. With both parties having an interest in this project,
DEI was constantly addressing solutions to concerns brought about by both
General Motors and the City of Detroit Engineering.

This project in Detroit, Michigan involved:
-
The
reconstruction of over 1/2 mile of concrete roadway with
complete sewer, water and electrical system along
existing streets near the Renaissance building.
-
3,313 linear feet of storm sewer 12" to 66"
-
900
linear feet of water main
-
Sophisticated electrical system
-
Irrigation system
-
Placement of 20,530 square yards of 10" reinforced concrete
pavement with integral curb
DEI completed this $6,153,558.00 project during
the 2003 construction season as scheduled in the contract documents.
Project Manager Dennis Rozanski
Project Superintendent Doug
Stroman
|